Damietta University

E-portal

News Calendar

Signing of jobs between the university and the Arab Contractors

The President of the University 15.02.2022 3841

(Signing the time plan between the university and the Arab contractors for the remaining projects)

      Today, Tuesday, February 15, 2022, professor Dr. El-Sayed Mohamad Dadour, President of the University, met with Eng. Hossam El-Reefy and a member of the Board of Directors of the Arab Contractors Company, to discuss the timetable for the remaining projects being implemented by the Arab Contractors Company, which are infrastructure and public facilities projects on the university campus in New Damietta. The meeting was attended by a number of engineers, the leaders of the Arab Contractors Company in the Damietta and Delta region, and from the university, professor Dr. Hatem Idrees, acting Dean of the Faculty of Engineering, Chairman of the Board of Directors of the Engineering Consultation Center at the university, professor Dr. Samir El-Gamal, Vice Dean of the Faculty of Law for Education and Students Affairs, the legal advisor to the president of the university, and professor Dr.  Khaled Al-Zuhary, Secretary-General of the University, and a number of administrative leaders in the financial and engineering affairs sector. The meeting was attended by a number of engineers, the leaders of the Arab Contractors Company in the Damietta and Delta region, and from the university, professor Dr. Hatem Idrees, acting Dean of the Faculty of Engineering, Chairman of the Board of Directors of the Engineering Consultation Center at the university, professor Dr. Samir El-Gamal, Vice Dean of the Faculty of Law for Education and Students Affairs, the legal advisor to the president of the university, and professor Dr.  Khaled Al-Zuhary, Secretary-General of the University, and a number of administrative leaders in the financial and engineering affairs sector. The meeting dealt with ways to increase implementation rates and performance in the projects implemented by the Arab Contractors Company, and the meeting ended with signing the timetable for the remaining projects implemented by the Arab Contractors Company, which are infrastructure projects and public utilities on the university campus in New Damietta. The president of the university stressed the necessity of the company's commitment to the timetable that was signed because of its positive effects on the educational and administrative process at the university.

قد تكون صورة لـ ‏‏‏‏2‏ شخصان‏، ‏أشخاص يجلسون‏‏ و‏منظر داخلي‏‏

قد تكون صورة لـ ‏‏‏‏5‏ أشخاص‏، ‏أشخاص يجلسون‏‏ و‏منظر داخلي‏‏

قد تكون صورة لـ ‏‏‏‏8‏ أشخاص‏، ‏أشخاص يجلسون‏‏ و‏منظر داخلي‏‏

 

قد تكون صورة لـ ‏‏‏‏6‏ أشخاص‏، ‏‏أشخاص يجلسون‏، ‏أشخاص يقفون‏‏‏ و‏منظر داخلي‏‏

قد تكون صورة لـ ‏‏‏‏4‏ أشخاص‏، ‏‏أشخاص يجلسون‏، ‏أثاث‏‏‏ و‏منظر داخلي‏‏

 

share news :
tweetshareshareshare

in E-portal We're happy with your participation by sending your comments via e-mail

portal@du.edu.eg